The Site Should Not Be Where Important Decisions Are Made For The First Time
Execution becomes more predictable when the drawings, dimensions, materials and interfaces have already been examined and approved.
This reduces assumptions, rework and hurried decisions during production or installation.
What Should Be Resolved
Planning
Room layouts, furniture positions, circulation and principal storage requirements.
Technical Coordination
Electrical points, lighting, appliances, plumbing, air-conditioning and other service interfaces.
Joinery Details
Internal configurations, dimensions, shutters, hardware, edges and functional clearances.
Materials & Finishes
Approved samples, colours, surface combinations, hardware and maintenance considerations.
Budget & Scope
The approved work, exclusions, allowances, payment milestones and recorded changes.
What Approval Should Establish
- What will be built
- Which drawing or sample governs the work
- What the client has reviewed
- What remains subject to site verification
- What is included within the approved scope
- Whether a later change affects cost or time
Approval does not mean asking the client to interpret technical drawings without assistance. The design team must explain what is being approved and record the agreed outcome.
Changes After Approval
The home can continue to evolve, but the implications of a change should remain visible.
Before proceeding, the affected drawings, materials, cost and programme should be reviewed and recorded.
Approval Is Not Paperwork. It Protects The Project From Assumption.
It gives the client, designer, production team and site team the same reference before materials are committed and execution begins.