APPROVAL CLARITY

The Site Should Not Be Where Important Decisions Are Made For The First Time

Execution becomes more predictable when the drawings, dimensions, materials and interfaces have already been examined and approved.

This reduces assumptions, rework and hurried decisions during production or installation.

What Should Be Resolved

  • Planning

    Room layouts, furniture positions, circulation and principal storage requirements.

  • Technical Coordination

    Electrical points, lighting, appliances, plumbing, air-conditioning and other service interfaces.

  • Joinery Details

    Internal configurations, dimensions, shutters, hardware, edges and functional clearances.

  • Materials & Finishes

    Approved samples, colours, surface combinations, hardware and maintenance considerations.

  • Budget & Scope

    The approved work, exclusions, allowances, payment milestones and recorded changes.

What Approval Should Establish

  • What will be built
  • Which drawing or sample governs the work
  • What the client has reviewed
  • What remains subject to site verification
  • What is included within the approved scope
  • Whether a later change affects cost or time

Approval does not mean asking the client to interpret technical drawings without assistance. The design team must explain what is being approved and record the agreed outcome.

Changes After Approval

The home can continue to evolve, but the implications of a change should remain visible.

Before proceeding, the affected drawings, materials, cost and programme should be reviewed and recorded.

Approval Is Not Paperwork. It Protects The Project From Assumption.

It gives the client, designer, production team and site team the same reference before materials are committed and execution begins.